Grant Line / Sheldon Feasibility Study

Project Study Area
Study Overview

The study will determine the potential impacts of the future widening of Grant Line Road in the Sheldon area (from Bond Road to Calvine Road).  Areas of focus will be preferred access configurations, intersection modifications, and to identify potential right-of-way needs for property owner planning purposes  

Previous efforts by the Connector JPA have identified several varied configurations of roadway improvements, but with direct input from property owners, this study would refine those ideas into one cohesive design direction that can be taken forward by the Connector JPA.

At the conclusion of the study period, the City will make available a document that can be used by property owners to plan their own site improvements, as well as to guide future design efforts by the Connector JPA.  Please see the JPA website for more information about the Capital Southeast Corridor: http://www.connectorjpa.net/.

Schedule
The study will take place over 2 years, and include several focus meetings with smaller groups of property owners and tenants to discuss and refine access needs and impacts.  

Powerpoint PresentationA general public meeting was held on Tuesday, February 2, 2016 to discuss the Study process.  The powerpoint presentation from this meeting is available here.

Past Focus Meeting dates:
Wilton Intersection – Thursday, March 31, 2016
Sheldon Intersection – Thursday, April 28, 2016

Upcoming Focus Meeting dates:
Focus Area 1 – Tuesday, May 17, 2016
Focus Area 2 & 5 will be moved to a date later this year with a new letter.


Focus Area 1 will be held at 6:00pm at Pleasant Grove Elementary School located at 10160 Pleasant Grove, Elk Grove, CA 95624.

Contact
If you have questions or concerns please contact:

Bryan Stone, Project Engineer
Phone: (916) 478-3646
Email: bstone@elkgrovecity.org