Aquatics Center


At the January 13, 2016 Council meeting, the City Council provided direction to proceed with the design of the Aquatic Center based on Alternative 4 from the Aquatic Center Study prepared by the Sports Management Group in December 2015.  Option 4 provides a balance of aquatic opportunities with a combination of pools designed to serve competitive aquatics, instruction, water fitness, and family recreation. This option provides three bodies of water including a 50-meter pool, a six lane fitness and instructional pool, and a recreational pool. Design is currently underway and is expected to be completed by early 2017. Construction is scheduled for 2017 with a grand opening by summer 2018. The current Aquatic Center concept drawings can be found at the following link:

Aquatic Center Concept