Archive

2020

Bid No. Title Posted
20-24 City Facility Gate Operator System Replacements Project (FM2104)(UPCCAA) 12/17/2020
20-23 Heating, Ventilation and Air Conditioning (HVAC) Maintenance Services 11/19/2020
20-22 Swimming Pool Chemical Supplies 10/29/2020
20-22 Grant Line Road Widening (Waterman to Bradshaw) Project (WTR002 10/27/2020
20-21 Vehicle Body Repair and Painting 10/05/2020
20-19 Drainage Shed A Channel Landscaping Enhancement (Shed A Trail) Project (WFL007) 9/3/2020
20-18 FY2021 Citywide Crack Seal Project (OM2101) 8/4/2020
PW-01 8401 Laguna Palms Way Wellness Room Project (FM2006)(UPCCAA) 7/27/2020
20-17 2019/2020 Citywide Curb Ramps Improvements Project - Phase 2 Laguna Boulevard at Harbour Point Drive (WAC014) and Teen Center Parking Lot Improvements Project (FM1903) 7/23/2020
20-16 Pavement Repairs - Grant Line Road, Kammerer Road, and Waterman Road (OM2009) 6/18/2020
20-14 Sheldon Road Bike Lanes and Turn Lanes Project (WTR054) 6/3/2020
20-13 Bond Road Median Improvements and Resurfacing Project (WTC015) 6/2/2020
20-15 The 2020 Pavement Slurry Seal and Resurfacing Project (WPR020) 5/28/2020
20-11 District56 Nature Area Project (WCE028) 5/5/2020
20-12 Original Equipment Manufacturer (O.E.M.) Maintenance, Repair, and Parts for City Vehicles 4/14/2020
20-09

City Hall Building Water Infiltration Project (FM1803)

4/9/2020
20-10

Railroad Street Improvements (WTR049) and Old Town Plaza Phase 2 and 3 (WCE022 Projects)

4/8/2020
20-03 2016 Bus Stop Accessibility Improvements Project (WAC027)(UPCCAA) 3/5/2020
20-05 Railroad Street Improvements (WTR049) and Old Town Plaza Phase 2 and 3 (WCE022) Projects 2/27/2020
20-08 Original Equipment Manufacturer (O.E.M.) Maintenance, Repair, and Parts for City Vehicles 2/27/2020
20-07 City Facilities Door Security Replacement Project (WFC018) 2/25/2020
20-06 Street Sweeping Maintenance Services (OM2005) 2/13/2020
20-04 Whitelock Parkway Pedestrian Signal Project (WAM014) 2/4/2020
20-02 New Unused Honda Accord Hybrid EX Sedans 1/9/2020
20-01 Elk Grove Library 2nd Floor Structural Repair and Flooring Replacement Project (FM1806)(UPCCAA) 1/8/2020

2019

Bid No. Title Posted
19-25 Weed Abatement Project (OM2008)
  • Notice of Intent to Award
  • 12/14/2019
    19-24 Pavement Repair in Preparation for WPR020 11/14/2019
    19-23 Traffic Signal and Street Light Maintenance Project (OM2003) 10/15/2019
    19-22 Public Works - Public Infrastructure Maintenance (PIM) Project (OM1904) 9/24/2019
    19-21 2020 Pavement Slurry Seal and Resurfacing Project (WPR020) - Phase 1 9/10/2019
    19-20 FY20 Citywide Crack Seal Project (OM2001) 8/8/2019
    19-19 Public Works - Public Infrastructure Maintenance (PIM) Project (OM1904) 7/25/2019
    19-18 Patrol Rifles, Rifle Optics, and Rifle Accessories 7/23/2019
    19-17 Bond Road Pavement Rehabilitation WTC015 Project (OM1906) 7/2/2019
    19-14 City Hall Building Water Infiltration Project (FM1803) 6/4/2019
    19-16 Fountain Water and Filter System Maintenance Project (AC1901)(UPCCAA) 6/3/2019
    19-15 2019/2020 Citywide Curb Ramp Improvements Project Phase 1 (WAC014) 5/30/2019
    19-13 2019 Pavement Slurry Seal and Resurfacing Project (WPR019) 5/29/2019
    19-12 Facilities Flooring Finishes Replacements Projects (FM1904)(FM1905)(WFC021)(WFC023)(WFC025) 5/2/2019
    19-11 Asphalt Concrete Repairs in Preparation for WPR019 (OM1905) 4/23/2019
    19-08 Office Furniture and Fixtures for the Elk Grove Animal Shelter(WFC012) 4/12/2019
    19-10 Tiffin Airflow Wardrobe Lockers Project (PD1902)(Rebid) 4/8/2019
    19-09 Elk Grove Boulevard and Laguna Boulevard UPRR XING Interim Bike Lane Improvements Project (WAM002) 4/4/2019
    19-07 Installation, Maintenance and Repair of Asphalt Concrete (AC) Roadways, Alleys, Speed Humps and Related Items (OM1902) 3/26/2019
    19-06 Tiffin Airflow Wardrobe Lockers Project (PD1902)(UPCCAA) 3/7/2019
    19-05 North Camden Area Storm Drain Improvements: North Camden Drive Storm Drain (WDR023) and Blakemore, Hartwell and Ely Courts Storm Drain (WDR038) Projects 2/12/2019
    19-04 Installation, Maintenance and Repair of Curbs, Gutters, Sidewalks and Related Items (OM1901) 2/6/2019
    19-03 Bruceville Road at Poppy Ridge Road/Quail Run Lane Intersection Signalization Project (WTR011) 1/10/2019
    19-02 Real Time Information Center Project Phase 2 (FM1705) 1/10/2019
    19-01 City Hall Reception and Clerk's Office Remodel (WFC017) and 8401 Laguna Palms Way Remodel (WFC032) 1/8/2019

    2018

    Bid No. Title Posted
    18-30 Sacramento County Water Agency (SCWA) Frontage Improvement Project (WFL003)(Rebid) 12/13/2018
    18-29 Police Duty Equipment 10/23/2018
    18-28 Crystal Geyser Bottled Spring Water 10/23/2018
    18-27 Sidewalk Infill Project 2018 (East Stockton Boulevard and Laguna Boulevard)(WAC032)(Rebid)(UPCCAA) 9/25/2018
    18-26 K-9 Training Area Landscaping Improvements (FM1901)(UPCCAA) 9/20/2018
    18-29 Strom Drain Pump Station Improvements Project (WDR029) 9/11/2018
    18-22 Real Time Information Center Project Phase 1 (FM1705) 9/6/2018
    18-21 Structure Demolition Project 2018 (WCE027/WTR027/WDR037/WCC017) 8/30/2018
    18-24 Dog Food Elk Grove Police Department Canine Unit 8/20/2018
    18-19 Sheldon Road and Waterman Road Landscape and Irrigation Phase 2 (PT0138) and Grant Line Road Overcrossing Landscape Improvements (WTR030) Projects 8/16/2018
    18-23 Ford Transit Vans with MAVRON Inc. Animal Services Caging System 8/16/2018
    18-20 Citywide Curb Ramps 2018 Project (WAC013) 7/24/2018
    18-18 Green Bike Lanes Pilot Project (WTC020)(UPCCAA) 6/28/2018
    18-17 Left Turn Lane Extension Westbound Laguna Boulevard at Laguna Park Drive (East) Project (WTC012) and Left Turn Pocket Extension Eastbound Laguna Boulevard at Franklin Boulevard Project (WTC013) 5/17/2018
    18-16 Emerald Vista Drive Storm Drain Improvements Project (WDR024) 5/17/2018
    18-11 Lower Laguna Creek Open Space Preserve Trail Project (WTL022)(Federal Project Number: ATPL-5479(051)) 5/8/2018
    18-13 Old Town Plaza Wall and Fence Replacement Project (FM1801)(UPCCAA) 5/4/2018
    18-15 Special Waste Collection Center Maintenance - Aerosol Can Crusher & New Exhaust Fans Project (WIW003) 5/3/2018
    18-07 Pavement Resurfacing 2018 Project (WPR018) 5/1/2018
    18-12 North Camden Area Storm Drain Improvements: North Camden Drive (WDR023) and Blakemore, Hartwell, and Ely Courts (WDR038) 4/26/2018
    18-10 Sacramento County Water Agency (SCWA) Frontage Improvement Project (WFL003) and Sidewalk Infill Project 2018 - East Stockton Boulevard and Laguna Boulevard (WAC032) 4/24/2018
    18-09 Waterman Road Rehabilitation and Bike Lanes Project (WPR010) (Federal Number STPL-5479(049)) 4/24/2018
    18-08 Pedestrian Crossings Upgrade Project (WTC019)(Federal Project Number: HSIPL-5479(055)) 4/19/2018
    18-14 Event Advertising Signs Pilot Program (WCE025) 4/18/2018
    18-06 Sheldon Road and Bradshaw Road Bridge Replacement and Intersection Improvements Project - City Project (PT0137) (Federal Number BRLS-5479(012)) 3/6/2018
    18-04 Elk Grove Animal Shelter Project (WFC012) 2/27/2018
    18-05 Special Waste Collection Center Unloading Area Improvements (WIW001) and Special Waste Collection Center Maintenance - Loading Dock Area Improvements (WIW003) Projects 2/15/2018
    18-02 Event Advertising Signs Project (WCE025) 2/8/2018
    18-01 Elk Grove Community & Senior Center Project (WCC010) 2/6/2018
    18-03 Systems Enclosures for External Mount Remote Cameras 1/24/2018

    2017

    Bid No. Title Posted
    17-24 Furnishing Three (3) Solar Powered Surveillance Trailers with Telescoping Masts 11/21/2017
    17-23 Heating, Ventilation, and Air Conditioning (HVAC) Maintenance Service 9/14/2017
    17-22 Civic Center Commons Fiber Optic Installation Project (WCC024) 9/7/2017
    17-20 Corporation Yard Parking and Entry Improvements Project (WCY005) 8/31/2017
    17-21 Barracuda Backup Appliance Upgrade 8/28/2017
    17-19 Intelligent Transportation Systems (ITS) Master Plan Phase 4 Implementation Project (WTC001) (Federal Project Number: CML-5479 (050)) 8/17/2017
    17-18 Teen Center Tile Roof Project 7/27/2017
    17-17 Big Horn Boulevard Extension (WTR026) and Bilby Road Extension (WTR029) Projects 7/20/2017
    17-15 Citywide Curb Ramps 2017 Project (WAC012) 7/11/2017
    17-16 Sleepy Hollow Detention Basin Project (WDR013) 7/7/2017
    17-14 Facility Flooring Finishes Replacement (WFM009) and Teen Center Flooring Replacement (FM1703) Projects 7/7/2017
    17-13 Bulk and Card Lock Unleaded Gasoline and Diesel Fuel 6/15/2017
    17-12 Installation and Repair of Vehicle Response Equipment and Lighting 6/15/2017
    17-07 S-153 Southeast Policy Area (SEPA) Sewer Pump Station and Force Main Project (WMI005) 6/1/2017
    17-11 Civilian Uniform Clothing 5/31/2017
    17-09 Police Uniforms 5/23/2017
    17-08 Pavement Rehabilitation and Reconstruction 2017 Project (WPR016) 5/9/2017
    17-10 Citywide Pavement Resurfacing 2017 Project (WPR017)(REBID) 5/8/2017
    17-06 Rural Roads Shoulder Backing Improvements Project (WRM001)(Rebid) Federal Project Number: HSIPL-5479(046) 4/18/2017
    17-05 Gilliam Drive Trail Connection Project (PT0124) 3/23/2017
    17-04 Aquatics Center (WCC002L) & Civic Center Commons (WCC024) Projects 3/21/2017
    Bidder Pre-Qualification WCC002L Bidder Pre-Qualification List for Elk Grove Aquatics Facility Project (WCC002L) 3/14/2017
    17-02 Citywide Pavement Resurfacing 2017 Project (WPR017) 3/14/2017
    17-01 Old Town Plaza Restroom Building Project (WCE021) 2/28/2017
    17-03 Old Town Plaza Site Improvements Project (WCE021) 2/27/2017

    2016

    Bid No. Title Posted
    16-20 Laguna Creek Trail - Camden South Spur & Camden North Spur Projects (PT0121/WTL005) 12/15/2016
    16-18 2017 Ford Transit Van with MAVRON, Inc. Animal Control Caging System 10/20/2016
    16-17 Vehicle Graphics 9/22/2016
    16-16 Office Construction and Service Center Ballistic Panel Install and Entrance Door Replacement Projects WFC010 and WFC009) 9/15/2016
    16-15 Rural Roads Shoulder Backing Safety Improvements Project (WRM001)(Federal Project Number: HSIPL-5479(046)) 9/1/2016
    16-14 Bridge Preventive Maintenance Project (WBR001)(Federal Project Number: BRLS-5479(043)) 8/25/2016
    16-12 2016 Slurry Seal Project (WPR015) 8/4/2016
    16-13 Economic Development and Military Street Banners 08/01/2016
    16-09 Big Horn/Laguna Bus Stop and Sidewalk Project (WAC021) 06/14/2016
    16-08 2016 Citywide Curb Ramp Improvements Project (WAC011) 05/24/2016
    16-10 New Tires for Passenger Vehicles, Emergency Response Vehicles, Light and Heavy Trucks, Transit Buses, and to provide Tire Services including Road Services 05/19/2016
    16-06 Elk Grove-Florin Road Sidewalk Infill at Strawberry Creek Project (WAC016) 05/10/2016
    16-07 Sheldon Road and Waterman Road Intersection Improvements Project (PT0138) 05/04/2016
    16-04 Railroad Quiet Zone at Dwight Road and Sims Road Project (WTR008) 03/03/2016
    16-03 Elk Grove-Florin Road at West Camden Sidewalk Infill Project (WAC009) 02/23/2016
    16-02 Citywide Decorative Streetlight LED Conversion Project (WSL005) 01/27/2016
    16-01 Elk Grove and Whitehouse Creek Trail Rehabilitation Project (WTL035) 01/05/2016

    2015

    Bid No. Title Posted
    15-16 Crystal Geyser Bottled Spring Water 10/22/2015
    15-15 Bond Road and Bader Road Traffic Signal Installation Project (PT0134) 10/20/2015
    15-14 Union Park Way Pavement and Drainage Rehabilitation (WPR007) 10/13/2015
    15-13 Southside Avenue Sidewalk Improvement Project (WAC008) 9/24/2015
    15-12 West Stockton Boulevard Sidewalk and Drainage Improvements Project (PD0008)(Rebid) 9/15/2015
    15-11 2015 Pavement Overlay Project (WPR013) 9/10/2015
    15-10 Elk Grove-Florin Road Drainage System Improvements Project (WDR001) 9/01/2015
    15-09 East Stockton Boulevard Sidewalk Extension to Elk Grove Park Project (WAC006) 8/25/2015
    15-06 Aquatics Facility (WCC002) and Civic Center Facilities Roadway (WCC023) Projects 8/20/2015
    15-08 West Stockton Boulevard Sidewalk and Drainage Improvements Project (PD0008) 08/06/2015
    15-07 2015 Slurry Seal Project (WPR009) 08/06/2015
    15-05 2015 Citywide Curb Ramps Improvements Project (WAC010) 06/16/2015
    15-04 Horseshoe Park Project (WCE004) 06/09/2015
    15-03 Wayfinding Signage Project (WCE006) 04/02/2015
    15-02 9200 Meadow Grove Improvements 03/31/2015
    Bidder Pre-Qualification WCC002 Bidder Pre-Qualification List for Elk Grove Aquatics Facility (WCC002) 03/20/2015
    RFP-15-03 Elk Grove Police Department Staffing Study 03/03/2015
    15-01 Elk Grove Boulevard, North Side, Sidewalk Infill Project 03/03/2015

    2014

    Bid No. Title Posted
    14-23 Elk Grove MESA II Processing Room Project (WFM008) 11/19/2014
    14-22 Police Rated Honda ST1300PA Motorcycles 09/29/2014
    14-20 2014 Slurry Seal Project (WPR008) 09/18/2014
    14-21 Citywide LED Luminaire Installation Project (WSL003) 09/11/2014
    14-19 City Hall ADA Improvements and Electric Vehicle Charging Station Install Project (WFM007/WFM006) 08/21/2014
    14-17 Corporation Yard Expansion Phase 2 – Materials Bin Storage Facility Project (WFC003) 08/21/2014
    14-18 LED Streetlight Luminaires 08/12/2014
    14-15 Transportation and Disposal Services for Fats, Oil, and Grease (F.O.G.) Collected at the Special Waste Collection Center 08/08/2014
    14-16 9750 Waterman Road Drainage and Accessibility Improvements Project (PT0139) 07/31/2014
    14-14 Dry Wells as Low Impact Development Improvements Project 07/08/2014
    14-13 Waterman Road Pavement Rehabilitation, South of Mosher to Old Waterman Road Project 07/03/2014
    14-11 Aerosol Can Crushing Disposal System to be used at the Special Waste Collection Center 05/15/2014
    14-12 Speed Control Improvements Phase 4 Project (WSC004) 05/08/2014
    Transit Bus Rehabilitation 04/28/2014
    14-08 Sheldon Road and Grant Line Road Traffic Signal Installation Project (WTC004) 04/15/2014
    14-10 Police Portable Radio Accessories 04/09/2014
    14-09 RE-BID Johnston Road Property Demolition Project (WCC003) 04/08/2014
    14-07 2014 Citywide Curb Ramp Improvements Project (WAC007) 04/07/2014
    14-06 Laguna Creek Weir Repair, East of Lewis Stein Project (WDR005) 04/03/2014
    14-04 Microsoft Office Professional Plus 2013 03/10/2014
    14-05 Johnston Road Property Demolition Project (WCC003) 03/06/2014
    14-01 Grant Line Road Widening Project (PT034A) 01/30/2014
    14-03 Police Duty Equipment 01/16/2014
    14-02 Police Uniform 01/16/2014

    2013

    Bid No. Title Posted
    13-23 Elk Crest Drive Storm Drain Pipe Replacement Project (PD0011) 11/21/2013
    13-22 Island Park Project (WCE002) 11/19/2013
    13-24 Transportation & Disposal Services for Pharmaceutical Waste Collected at The Special Waste Collection Center 11/15/2013
    13-21 Elk Grove-Florin Road and East Stockton Boulevard Intersection Realignment Project (PT0085)\ 11/05/2013
    13-20 Sheldon Road-Bader Road Culvert Replacement Project (WDR002 and WDR003) 10/03/2013
    13-19 Campbell Road Drainage Improvements Project (PD0010) 08/28/2013
    13-18 Lease and Maintenance of Multi-function Printers, and Maintenance of Wide Format and Laser Printers Proposers Price Sheets:
    07/12/2013
    13-17 Storybook Woods Park Project (WCE003) 07/09/2013
    13-14 Elk Grove Boulevard/State Route 99 Interchange Modifications Project (PT0055) 07/03/2013
    13-15 Data Collection System for the Special Waste Collection Center for the City of Elk Grove 06/28/2013
    13-16 Transportation and Disposal Services for Tires Collected at the Special Waste Collection Center 06/28/2013
    13-13 Waterman Road Culvert Replacements near Elk Grove Boulevard and Hudson Ranch Projects (WDR008/WDR009) 06/18/2013
    13-12 Police Unit Move (10250 Iron Rock Way) & City Hall Entrance Doors 8401 Laguna Palms Way) Projects 05/28/2013
    13-11 Grant Line Access Road Project (WTR006) 05/16/2013
    13-10 New Factory Ammunition 05/09/2013
    13-08 Elk Grove Boulevard Sidewalk Infill between Waterman Road and Kent Street Project (WAC001) 04/19/2013
    13-09 Tree and Vegetation Removal on the Laguna West Levees East of Interstate 5 and South of Elk Grove Boulevard Project 04/12/2013
    13-07 School Street Alley Drainage Improvements Project (WDR007) 04/04/2013
    13-06 Emerald Park Drive Storm Drain Improvement Project (WPR001) 03/25/2013
    13-05 Emergency Operations Center – Traffic CCTV Traffic Monitoring Camera Installation Project (EOC002) 03/11/2013
    13-03 Elk Grove Creek Trail Crossing at State Route 99 Project 02/22/2013
    13-04 2013 Citywide Curb Ramp Accessibility Improvements Project (WAC005) 02/19/2013
    13-02 Tree Removal at Elk Grove Boulevard/State Route 99 Interchange Project (WTR005) 01/22/2013
    13-01 9716 Waterman Road Accessibility Improvements Project (WAC004) 01/14/2013

    2012

    Bid No. Title Posted
    12-17 Project: Transitional Housing Rehabilitation Project (CDBG-11-11) 12/27/2012
    12-16 Elk Grove Boulevard at Elk Grove-Florin Road Bus Turnout Project (WTE003) 12/06/2012
    12-15 East Stockton Sound Wall Renovation Project (WCE001) 11/20/2012
    12-14 Union Pacific Railroad (UPRR) Parcel Fence Project (WMI001) 11/05/2012
    12-12 Laguna Creek Trail Connection at Camada Court Improvement Project 11/05/2012
    12-13 Rooftop Water Heater Replacement Project 10/22/2012
    12-11 Library Stair and Exterior Waterproofing Refurbishment Project (WFM001) 10/04/2012
    12-10 Future Civic Center Site Demolition Project (WCC001) 08/17/2012
    12-09 2012 Slurry Seal Project (WPR004) 08/16/2012
    12-08 Citywide Bus Stop Shelter Improvements Project – Phase II (WTE002) Federal Project Number STPL-5479(039) 06/19/2012
    12-07 Median Landscape Enhancement Project Willard Parkway – Elk Grove Boulevard (PT0110) 06/14/2012
    12-06 Special Waste Collection Center (SWCC) and Disposal Lane Project (SW0002 and SW0003) 04/17/2012
    12-04 Emergency Operations Center (EOC) Project (EOC001) 04/06/2012
    12-05 Citywide Curb Ramp Accessibility Improvements Project WAC002 03/22/2012
    12-03 Longleaf Drive Bridge Project 03/08/2012
    12-03 Special Waste Collection Center (SWCC) and Disposal Lane Project (SW0002 and SW0003) 03/06/2011
    12-01 Heating, Ventilation & Air Conditioning (HVAC) Maintenance Services 01/05/2012

    2011

    Bid No. Title Posted
    11-17 Elk Grove Creek Pipe Outfalls (WDR004) and Dry Well Installations (WDR012) Drainage Improvements Projects 12/01/2011
    11-16 Neighborhood Livability (Speed Control) Improvement Phase 2 (WSC002) and 3 (WSC003) 11/01/2011
    11-15 Quail Run Lane and Bruceville Road Intersection Southwest Corner Improvements Project PT0112 10/13/2011
    11-12 Elk Grove Teen Center Retrofit Replacement Window Project 09/23/2011
    11-14 Old Town Stub (9070 Elk Grove Boulevard) Drainage Improvements Project WDR006 09/15/2011
    11-13 Asphalt Concrete Overlay & Rubberized Emulsion Aggregate Slurry Seal Project WPR002 09/07/2011
    11-11 Rain Garden Plaza Project WDR010 08/12/2011
    11-10 Citywide Bus Stop Improvements - Phase 1 PF014A 08/09/2011
    11-09 Markofer Elementary Pedestrian/Bicycle Trail Improvements Project 07/18/2011
    11-07 Elk Grove-Florin Road Pedestrian Improvements Project PT0132 07/14/2011
    11-08 Corporation Yard Expansion Project 07/07/2011
    11-05 Neighborhood Livability (Speed Control) Project PT0077 05/19/2011
    11-06 Household Hazardous Waste Collection Facility (HHWCF) Roof Mounted Photovoltaic System Project 05/17/2011
    11-03 Human Resources Tenant Improvements Project 05/09/2011
    11-02 2011 LED Streetlight Conversion Project PT0083 03/25/2011
    11-01 Corporation Yard Warehouse Building Improvements 10250 Iron Rock Way Project 03/10/2011

    2010

    Bid No. Title Posted
    10-24 Whitelock Parkway Landscape and Pedestrian Improvements Project PT0087 10/08/2010
    10-23 Grant Line Road / State Route 99 Interchange and Sheldon Road /State Route 99 Interchange Landscaping Project PT009L and PT010L 09/29/2010
    10-22 Williamson Drive Sidewalk Project PT0133 09/24/2010
    10-21 Library South Stair Refurbishment Project 09/09/2010
    10-21 Public Works Services 08/23/2010
    10-20 Harbour Point Rehabilitation Project PT0131 08/12/2010
    10-19 Promenade Mall Detention Basin Flap Gate Installation Project PD0006 08/05/2010
    10-17 Police Reorganization Tenant Improvements Project 8380 - 8400 Laguna Palms Way 08/04/2010
    10-18 Slurry Seal 2010 Project PT0116 07/15/2010
    10-16 East Franklin Area Roadway Improvements Project PT0112 07/08/2010
    10-15 Waterman Road Re-Alignment Project PT0080 06/25/2010
    10-13 East Stockton Boulevard / Sheldon Road Park and Ride Lot Landscaping Project 06/17/2010
    10-14 Bond Road at East Stockton Boulevard Median Island Improvement PT0107 and Elk Grove Boulevard at Laguna Springs Drive Median Island Improvement PT0119 Projects (RE-BID) 06/17/2010
    10-11 Poppy Ridge Intelligent Transportation Systems (ITS) Project PT0111 05/17/2010
    10-12 Bond Road at East Stockton Boulevard Median Island Improvement PT0107 and Elk Grove Boulevard at Laguna Springs Drive Median Island Improvement PT0119 Projects 05/14/2010
    10-10 Asphalt Concrete Overlay and Curb Ramp Improvements Project PT3510 and PT5810 05/04/2010
    10-08 Elk Grove Corporation Yard Elkmont Way Entrance Improvements Project PF0017 04/29/2010
    10-07 Elk Grove-Florin Road/Brown Road-Silverberry Avenue Traffic Signal and Intersection Improvements Project PT0091 04/22/2010
    10-09 Street Sweeping Maintenance Services 04/02/2010
    10-06 Grant Line Channel Restoration Project PD0003 04/01/2010
    10-05 Elk Grove-Florin Road Pavement Rehabilitation Project PT0101 03/25/2010
    10-04 Franklin Boulevard/Elk Grove Boulevard Intersection and Bus Turnouts Widening Project PT0001 03/17/2010
    10-03 Stonebrook Drive Pedestrian/Bicycle Trail Improvements Project PT0108 03/05/2010
    10-02 Poppy Ridge Street Light Retrofit Project PT0106 02/25/2010
    10-01 City Hall and Library Flagpole Project 02/01/2010

    2009

    Bid No. Title Posted
    09-14 East Franklin ITS and Traffic Signal Improvements and East Franklin Pedestrian Crossing Improvements PT0093 and PT0094 10/22/09
    09-13 CDBG Accessibility Curb, Gutter and Sidewalk Improvements Project PT0097 10/13/09
    09-12 Intelligent Transportation Systems (ITS) Phase 1C Project PT0057 09/17/09
    09-11 I-5/Elk Grove Boulevard Northbound On-Ramp Project PT0086 08/06/09
    09-10 Franklin Boulevard, Wilton Road & Kammerer Road Pavement Rehabilitation Project PT0100< 07/24/09
    09-09 City Hall Tenant Improvements Project - 8401 Laguna Palms Way 07/15/09
    09-08 Police Fence Project - 8380 Laguna Palms Way 07/15/09
    09-07 Slurry and Chip Seal 2009 PT0098 07/15/09
    09-06 Harbour Point Drive Median Improvements (Renwick to Maritime) Project PT0092 07/15/09
    09-05 CANCELLED Grant Line Channel Restoration Project PD0003 07/15/09
    09-04 Asphalt Concrete Overlay Project 2009 PT3509 and PT0096 04/07/09
    09-03 Franklin Boulevard Rehabilitation Project (Elk Grove to Laguna) PT0095 03/31/09
    09-02 Elk Grove Boulevard Rehabilitation Project (Franklin to Bruceville) PT0068 03/17/09
    09-01 West Stockton Boulevard Bridge Replacement Over Laguna Creek Bridge PT0033 02/17/09

    2008

    Bid No. Title Posted
    08-15 Sheldon Rd/SR 99 Interchange Zone 2 Electroliers Project 08/19/08
    08-14 Slurry and Chip Seal Project 2008 08/07/08
    08-13 Asphalt Concrete Overlay & Curb Ramp Improvements 2008, PT3508 & PT5808 07/08/08
    08-12 CDBG Bus Stop Improvements Project (PF0015) 07/22/08
    08-11 Compressed Natural Gas (CNG) Temporary Fuel System 07/03/08
    08-10 Elk Grove Boulevard/Elk Grove-Florin Rd Intersection Improvements Project PT0063 07/08/08
    08-09 Signage for Elk Grove Old Town Library Project 07/03/08
    08-08 Micro-Surfacing and Chip Seal Project 2008 (PT0082) 06/24/08
    08-07 Elk Grove Boulevard Median and Widening Improvements (PT0040, PT0032, and PT0028) 06/03/08
    08-06 Safe Routes to School - Laguna Creek Pedestrian Bridge Project PT0065 05/20/08
    08-05 Elk Grove Elementary Safety Improvement Project PT0065 04/29/08
    08-04 Elk Grove (Old Town) Library Project 03/11/08
    08-03 East Stockton Boulevard Bikeway Project PT0025 02/26/08
    08-02 Franklin Boulevard / Percheron Drive and Franklin Boulevard / Blossom Ridge Drive Signal Upgrade Project PT0079 02/19/08
    08-01 Stockton Boulevard Rehabilitation Project 02/12/08
    07-08 Intelligent Transportation Systems Phase 1B Project 11/13/07
    07-07 Sheldon Road / State Route 99 Interchange Reconstruction Project Number: PT0010 10/23/07
    07-06 Elk Grove Florin Road / Campbell Road Intersection Improvements and Franklin Boulevard / Willard Parkway Intersection Improvements 09/18/07
    07-05 Sheldon Interchange Demolition Project
    07-04 Asphalt Concrete Overlay and Curb Ramp Improvements Project 2007 PT3507 04/17/07
    07-03 Harbour Point Drive Improvements Project PT0020 04/17/07

    © 2021 City of Elk Grove. All Rights Reserved.