Improvement Plan Transmittal Certification

Improvement Plan Transmittal Certification

Submit A New Improvement Plan Transmittal Certification

  • Current Prepare Your Files
  • Project and Engineer Information
  • Document Checklist
  • Signature
  • Download Cover Sheet
  • Upload Files

Rename Your Files to Match the Following Titles

Documents must be separate files

  • Signed Stamped Transmittal Certification
  • Civil Improvement Plans
  • Landscape Plans
  • Traffic Signal Plans
  • Drainage Report
  • Low Impact Development Calculations
  • Private Development: Treatment Control Measure
    • Name and title of the person who will sign the agreement on behalf of the partnership, along with a supporting document from the partnership authorizing this person to sign.
  • Stormwater Pollution Prevention Plan
  • Conditions of Approval Implementation Matrix
  • Soils Report
  • Structural Calculations
  • Engineer’s Preliminary Cost Estimate
  • Title Report with Schedule B Documents
  • Project Billing Information Form
  • Property Owner Letter of Authorization

Need to Defer an Item?

You must receive written/email authorization from the City. Deferred items must be included in your second package.

Eligible deferrals:

  • Landscape Plans
  • Traffic Plans
  • Stormwater Pollution Prevention Plan (SWPPP)
Request Authorization 

Development Engineering Manager
Thomas Garcia
dengineering@elkgrovecity.org 
(916) 627-3436

Content Rating

Was this content useful?